Item To Address |
By Whom |
When |
Status |
|
I. |
Projects Development Outline |
||||
General Site Information |
|||||
Address of Tract |
|||||
Legal Description |
|||||
Deed Restrictions |
|||||
Easements |
|||||
Site Location Map |
|||||
Current Property Owner |
|||||
Current Property Use |
|||||
Planned Property Use |
|||||
Property Area |
|||||
Property Dimensions |
|||||
Physical Characteristics: |
|||||
Topography |
|||||
Conditions |
|||||
Slope analysis |
|||||
Visibility analysis |
|||||
Circulation analysis |
|||||
Storm water drainage analysis |
|||||
Unique features (ravines/pits) |
|||||
Property Configuration |
|||||
Boundary limitations (acute angles, |
|||||
peninsula, frontage) |
|||||
Vehicular/Pedestrian Access |
|||||
Location, capacity and condition of roads, |
|||||
rail, transit and paths |
|||||
Geology and Soil |
|||||
Underlying geology, rock character and |
|||||
depth |
|||||
Soil type and depth, value as an engineering |
|||||
material and as a plant medium |
|||||
Fill, ledge, slides, subsidence |
|||||
Surface Water |
|||||
Existing water bodies (quantity and quality) |
|||||
Natural and man made drainage channels |
|||||
(flow, capacity, quality) |
|||||
Surface drainage pattern (amount, blockage, |
|||||
undrained depressions) |
|||||
Water table (elevation and fluctuation, |
|||||
springs) |
|||||
Floodplain |
|||||
Wetland |
|||||
Climate |
|||||
Regional data on variation of temperature, |
|||||
precipitation, humidity, solar angle, |
|||||
cloudiness, wind direction and force |
|||||
Microclimates: warm and cool slopes, air |
|||||
drainage, wind deflection and local breeze, |
|||||
shade, heat reflection and storage, plant |
|||||
indicators |
|||||
Sound levels, smell, atmospheric quality |
|||||
Ecology |
|||||
Dominant plant and animal communities- |
|||||
location and relative stability |
|||||
Protected plant and animal species and |
|||||
habitats |
|||||
Man-made Structures |
|||||
Buildings, walls, fences (location, historic |
|||||
significance, floor elevations, type, |
|||||
condition, use) |
|||||
Subsurface structures |
|||||
Archaeological Resources |
|||||
Plotting from historical and/or museum |
|||||
commissions |
|||||
Visual land forms |
|||||
Anticipated artifacts |
|||||
Surrounding Land Uses |
|||||
Character and relation |
|||||
Quality and variation of light, sound, air |
|||||
Potential hazards |
|||||
Neighbors - names and descriptions |
|||||
Historic On-Site Activities |
|||||
Prior development applications |
|||||
Previously removed structures and use |
|||||
Regional Architectural Character of Building |
|||||
Facades |
|||||
Structural configuration and scale |
|||||
Architectural details |
|||||
Type and relationship of material |
|||||
Texture and colors |
|||||
Relationship to landscaping |
|||||
Utilities - The location, capacity, future plans and contact person for: |
|||||
Water supply |
|||||
Sanitary sewer disposal |
|||||
Storm sewers |
|||||
Electric service |
|||||
Gas service |
|||||
Telephone service |
|||||
Cable TV |
|||||
Community Services and Facilities - The location, capacity, future plans and contact person for: |
|||||
Police |
|||||
Fire protection |
|||||
Street lighting |
|||||
Recreation |
|||||
Trash collection |
|||||
Snow removal |
|||||
Schools |
|||||
Emergency medical |
|||||
Mass transit |
|||||
Development Controls: |
|||||
Analyze both written ordinances and attitude toward development |
|||||
Legal Issues |
|||||
Political structure |
|||||
Contract persons |
|||||
Land use plans |
|||||
New highway plans |
|||||
Zoning controls |
|||||
Site design controls |
|||||
Easements |
|||||
Building codes |
|||||
Fire codes |
|||||
Life safety codes |
|||||
Health codes |
|||||
Conservation controls |
|||||
Highway controls |
|||||
Impact fees |
|||||
Local permits |
|||||
State permits |
|||||
Federal permits |
|||||
Off-site improvement policy |
|||||
Plan processing schedule |
|||||
Public and private intentions for future use of site |
|||||
II. |
Project Specification Outline |
||||
Division 1: General Conditions |
|||||
Building Type |
|||||
Size |
|||||
Ground Floor Area |
|||||
Supported Levels (No.) x Area/Level |
|||||
Below Grade Area |
|||||
Floor to Ceiling Height |
|||||
Design Criteria Live Loads: Roof |
|||||
Psf. End Walls |
|||||
Typical Bay Spacing |
|||||
Structural Frame |
|||||
Fireproofing |
|||||
Estimating |
|||||
Labor Market |
|||||
Bond |
|||||
Division 2: Sitework |
|||||
Demolition Site |
|||||
Topography |
|||||
Subsurface Exploration |
|||||
Site Area |
|||||
Clearing and Grubbing |
|||||
Topsoil |
|||||
Soil Type |
|||||
Rock |
|||||
Ground Water |
|||||
Bulk Excavation |
|||||
Backfill |
|||||
Building Excavation |
|||||
Storm Drains |
|||||
Building Sub Drains |
|||||
Temporary Erosion Control |
|||||
Water Supply |
|||||
Sewers |
|||||
Parking Area |
|||||
Curbs |
|||||
Parking Bumpers |
|||||
Painting Lines |
|||||
Guard Rail |
|||||
Sidewalk |
|||||
Steps |
|||||
Signs |
|||||
Traffic Signals |
|||||
Fencing |
|||||
Fountains |
|||||
Planters |
|||||
Playground Equipment |
|||||
Retaining Walls |
|||||
Lawns & Planting |
|||||
Division 3: Concrete |
|||||
Footings |
|||||
Underslab Fill |
|||||
Vapor Barrier |
|||||
Perimeter Insulation |
|||||
Slab on Grade |
|||||
Walls |
|||||
Stairs |
|||||
Division 4: Masonry |
|||||
Exterior Walls |
|||||
Interior Walls |
|||||
Face Brick |
|||||
Glazed Concrete Block |
|||||
Simulated Stone |
|||||
Division 5: Metals |
|||||
Design Criteria |
|||||
Structural System |
|||||
Corner Guards |
|||||
Expansion Joints |
|||||
Ladders |
|||||
Louvers |
|||||
Mat Frames |
|||||
Pipe Bumpers |
|||||
Railings |
|||||
Stairs |
|||||
Stair Treads |
|||||
Trench Covers |
|||||
Division 6: Carpentry |
|||||
Nailers |
|||||
Roof Trusses |
|||||
Sheathing |
|||||
Siding |
|||||
Cabinets |
|||||
Counter Tops |
|||||
Cupolas |
|||||
Door Trim |
|||||
Division 7: Moisture Protection |
|||||
Building Paper |
|||||
Caulking |
|||||
Control Joints |
|||||
Membrane Waterproofing |
|||||
Building Insulation |
|||||
Masonry Insulation |
|||||
Perimeter Insulation |
|||||
Roof Deck Insulation |
|||||
Shingles |
|||||
Aluminum |
|||||
Vinyl Siding |
|||||
Built Up Roofing |
|||||
Elastic Sheet Roofing |
|||||
Downspouts |
|||||
Expansion Joints |
|||||
Flashing |
|||||
Gutters |
|||||
Metal Roofing |
|||||
Soffit |
|||||
Roof Drains |
|||||
Roof Hatches |
|||||
Smoke Hatches |
|||||
Snow Guards |
|||||
Skylights |
|||||
Division 8: Doors, Windows & Glass |
|||||
Hollow Metal Frames |
|||||
Hollow Metal Doors |
|||||
Aluminum Frames |
|||||
Wood Doors |
|||||
Overhead Doors |
|||||
Rolling Doors Exterior |
|||||
Store Fronts |
|||||
Windows |
|||||
Finish Hardware |
|||||
Automatic Openers |
|||||
Automatic Operators |
|||||
Mirrors |
|||||
Division 9: Finishes |
|||||
Drywall Finishes |
|||||
Sound Deading Board |
|||||
Ceramic Tile |
|||||
Ceilings |
|||||
Carpet |
|||||
Resilient Floors |
|||||
Painting |
|||||
Wall Covering |
|||||
Division 10: Specialties |
|||||
Bathroom Accessories |
|||||
Fire Extinguishers |
|||||
Flagpoles |
|||||
Signs |
|||||
Division 11: Architectural Equipment |
|||||
Dock Equipment |
|||||
Food Service Equipment |
|||||
Parking Equipment |
|||||
Playground Equipment |
|||||
Special Equipment |
|||||
Division 12: Furnishings |
|||||
Blinds, Interior |
|||||
Floor Mats |
|||||
Division 13: Special Construction |
|||||
Division 14: Conveying Systems |
|||||
Division 15A: Plumbing |
|||||
Building Drainage |
|||||
Sanitary System |
|||||
Domestic Cold Water |
|||||
Domestic Hot Water |
|||||
Piping |
|||||
Insulation |
|||||
Fixtures |
|||||
Drinking Fountain |
|||||
Hose Bibb |
|||||
Lavatory |
|||||
Sinks |
|||||
Urinals |
|||||
Water Closets |
|||||
Division 15B: HVAC Systems |
|||||
Gas Supply System |
|||||
Heating Plant |
|||||
Cooling Plant |
|||||
Air Handling Units |
|||||
Distribution |
|||||
Insulation |
|||||
Division 15C: Fire Protection System |
|||||
Fire Protection |
|||||
Division 16: Electrical Systems |
|||||
Incoming Service |
|||||
Voltage |
|||||
Building Service: Size Amps |
|||||
Emergency System |
|||||
Telephone System |
|||||
Fire Alarm System |
|||||
Clock System |
|||||
Sound System |
|||||
Lighting Protection |
|||||
Lighting Fixtures |
|||||
Special Considerations |
|||||
At the onset of the project, the project team will review the "items to address" and agree upon responsibility and completion times |